1. General installation Guide
8
4. Installation process & Guideline
Striking a balance between System Installation & General Construction Work.
.
Note: 1. The division of the work should be thoroughly clarified. (This applies particularly to
work relating to the connection of control wiring, fitting of remote controller and
central control panel, boundary work on areas such as connection of drain piping
and humidification supply piping, inspection and foundation)
2. Keep a constant check on the progress of the construction work to avoid deviations
from the air conditioning work schedule.
3. For sleeve and insert work the positions of ceiling girders should be confirmed and
sleeve and insert requirement, hole diameters, positioning and numbers decided.
This is particularly important in the case of sleeves for drain piping.