
Installation guide
13
(3) Brazing the branch pipes
Process photo Work details
(installer)
Items to check (manager)
Brazing the
branch pipe.
- Nitrogen substituted
brazing works on the
branch pipe to prevent
generation of foreign
substance/oxide
- Check for adequate
pressure (0.01 to
0.1kg/cm
2
Check the pressure and
entry of nitrogen.
)
3) Refrigerant pipe works (air tightness works)
(1) Entry of nitrogen
Process photo Work details
(installer)
Items to check (manager)
Entry of nitrogen.
Inject nitrogen to
the pipe to test
leakages.
Inject nitrogen at the
proper pressure.
1
st
: 10kg/cm
2
2
nd
: 41kg/cm
In the presence of the
manager, check air tightness.
Fill out the check forms.
2
(2) Processing the end of the pipe
Process photo Work details
(installer)
Items to check (manager)
Wrap the end of
the pipe before
connecting the
equipment, so
that nitrogen
won’t escape.
Sufficient brazing on the
end of the pipe.
Visual inspection
(3) Pressure meter displays
Process photo Work details
(installer)
Items to check (manager)
Mark the 1
st
and
2
nd
1
pressure to
see if it leaks.
st
: 10kg/cm
2
2
nd
: 28kg/cm
2
Check for leakages.
look at the
scale.
Comentarios a estos manuales