Samsung AVXTJ series Guía de instalación Pagina 133

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 137
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 132
Installation guide
133
11. Pump-Down Operation
1) General Instructions
(1) Pump-down operation is to gather the refrigerant into outdoor unit.
(2) If system is under extremely low pressure, compressor will be damaged. When low pressure go
down 2kgf/ or below, close the service valve quickly.
2) Procedure of Pump down operation
Close Liquid SVC Valve
Close Gas SVC Valve of Sub Unit
Single Installation
Group Installation
Press “K2” button 3 times
for pump down operation
Push “K4” button 4 times for
checking low pressure *1)
*1) “40 32”
- “4” means low pressure view mode
- “0 32” means low pressure is 3.2kgf/g
If low pressure
2kgf/
Comp. On
Close Gas SVC Valve
(of Main Unit)
Press “K2” button 2 times
or “K3” button 1 time
for the end of pump down operation
Press “K2” button 3 times
for pump down operation
Wait 20~30minutes
Comp. On
Close Liquid SVC Valve of Sub Unit
Close Liquid SVC Valve of Main Unit
Vista de pagina 132
1 2 ... 128 129 130 131 132 133 134 135 136 137

Comentarios a estos manuales

Sin comentarios