Installation guide
27
Class
Pre-check items
Handling methods and rules
Reference
Ceiling
finishing
-What is the finishing material
for ceiling?
- If the ceiling is made of plaster
boards, install an access hole
depending on the internal height
of the ceiling.
-If the ceiling is made of ceiling tile
then no need to install an access
- Is the ceiling sunken?
※
Need space at least
500mm(20inch) away from the
equipment at sunken part of
Installation at sunken
ceiling
Access hole
-Can you install an access
hole for interior finishing?
- Did you check the work
scope of access hole
installation?
-Did you notify the access
size of the duct type indoor
unit in advance?
※
Access hole is necessary for
Duct type indoor unit, ERV,
MCU and distribution kit.
- Check the access hole size for
each product.
-
Installation
space
-Is the installation space for
the indoor unit sufficient?
※
Obey the incline and pumping
height.
- Drain incline (1/100)
- Drain pumping height should be
less than 750mm(30inch) from
the bottom of the indoor unit.
-
Installation
height
- Is the 4way indoor unit
installed within 3.5
meter(11.5ft) from the
ground?
※
When the ceiling height is
exceed 3.5m(11.5ft), use a
special kit for high ceiling,
maximum 5.2m(17ft) or switch
to a duct-type indoor unit.
Inefficient or poor
Vertical pipe
- Did you review the path for
the vertical pipe?
※
Can’t install it in the EPS room
or high voltage room.
-
Horizontal
running pipe
- Must obey the max permitted
pipe length from the initial
branch.
※
Avoid indoor installation of the
brazed joints or the branch pipe.
-
High
elevated
pipe
height between indoor and
outdoor unit. (50 /40m*)
- Must obey the maximum
height between indoor units.
* As an outdoor unit is located in a
lower position than indoor unit,
level difference is 40m.
-
Comentarios a estos manuales