6) Recommended Case
(1) Construct a concrete foundation in accordance with the standards for the site where outdoor
unit is being installed.
H-beam: over 200mm
Area of the concrete foundation must be 1.5 times larger than the outdoor unit.
Concrete foundation shouldn’t be slanted and condensed water needs to flow away
without any stagnation
(2) After placing the outdoor unit on the basic foundation, fix the outdoor unit with the anchor
bolt(M12).
(3) Install the anti-vibration pad between the outdoor unit, H-beam and the concrete foundation.
(t = over 20mm)