Samsung AVXTJ series Guía de instalación Pagina 44

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 137
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 43
2. Preparation for installation
44
Problem analysis
Selecting ø22.23 copper pipe, and 10mm insulation as
shown in the picture.
Consequence
Low insulation effect cause large energy consumption
and decrease in system performance.
Condensation will easily form and leakage may occur
when performing heating operation in regions with high
temperature and humidity.
Standard procedure
Insulation material and quality must meet the minimum
standard thickness requirements.
Good installation will prevent condensation and
guarantee air conditioning performance.
Proper method
Follow the below specification strictly and aware of the
Minimum thickness requirements.
Pipe size
[mm]
Minimum thickness of insulation [mm]
PE foam
EPDM foam
Ø6.35~19.05
13
10
Ø22.23~31.75
19
13
Ø38.10
25
19
Ø44.45~
32
25
The thickness of insulation must be increased in case of
high humid conditions (over than 27°C and RH 80%)
like below place
- Tropical / Subtropical regions or equivalent with this
region
- The region where problems due to high temperature
and humidity are expected
- Restaurant, hot spring, sauna, basement, seaside
-
Ceiling inside with high humidity due to weak
ventilation
Vista de pagina 43
1 2 ... 39 40 41 42 43 44 45 46 47 48 49 ... 136 137

Comentarios a estos manuales

Sin comentarios