Samsung AVXTJ series Guía de instalación Pagina 22

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 137
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 21
1. General installation Guide
22
(2) Refrigerant injection
Process photo Work details
Things to obey
(installer)
Items to check
(manager)
Refrigerant
injection
- Accurate refrigerant
injection
- Keep the Gas cylinder
vertically downward
during charging.
Estimate the adequate
amount of refrigerant.
(3) Completed injection of refrigerant
Process photo Work details
Things to obey
(installer)
Items to check
(manager)
Completed
injection of
refrigerant
Check if the amount of
injection is accurate.
Check the adequate
amount.
9) Decoration Panel installation (other than the reference floor)
(1) Check the levelness of the indoor unit
Process photo Work details
Things to obey
(installer)
Items to check
(manager)
Maintain a
distance
between the
ceiling and the
indoor unit.
Use a paper pattern to
maintain an adequate
separation (adjust the
height of the indoor unit).
Check the levelness of the
indoor unit.
Vista de pagina 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 136 137

Comentarios a estos manuales

Sin comentarios