Samsung SV-651B Manual de servicio Pagina 65

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 226
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 64
GE HEALTHCARE
D
IRECTION 5194296-100, REVISION 10 LOGIQ BOOK XP SERIES BASIC SERVICE MANUAL
Chapter 3 Installation 3-9
Section 3-5
Completing the Installation
3-5-1 Power On / Boot Up
NOTE: After turning off a system, wait at least ten seconds before turning it on again. The system may not be
able to boot if power is recycled too quickly.
3-5-1-1 System Power On
Lower the handle. Plug the AC adapter output connector into the system DC input port (located on the
system’s rear panel) with the arrow side upward. Plug the AC adapter power cord into a grounded,
protective earth outlet.
Figure 3-5 connect AC adapter
When power is applied to the system, power is distributed to the Cooling Unit, Control Panel, LCD,
Peripherals and the Back-end Processor.
CAUTION
The system should rest on the handle to allow an air gap to prevent overheating.
Vista de pagina 64
1 2 ... 60 61 62 63 64 65 66 67 68 69 70 ... 225 226

Comentarios a estos manuales

Sin comentarios