Power Management (Continued)
5
Tap [ ] or [ ] to change the Alarm level control period.
Changes in Total active power and Current demand
power will be displayed in basis of target demand.
If Total active power or Current demands power is
larger than Target demand, Alarm level will turn red.
Alarm level control period is between 12~59 seconds.
6
Tap [Setup]
Note
Target Demand: This is the maximum amount of power
set by user.
Current Target Power Demand: This is the amount of
power left before reaching the Target Demand.
Total Activef Power: This is current power usage in kW
unit.
Current Demand Power: This is the accumulated
demand power from starting period.
Power monitoring: Function which monitors current
power and the maximum power.
To monitor peak power and power, you need at least
one designated DMS connected to a peak control
transmitter.
5
6