
Moving Scheduled Contents
Registered content schedules can be moved.
Drag and move a content schedule with the mouse to a desired location.
1
2
A moved content schedule can be returned to its previous place.
Click on a moved content schedule and click “Undo Move” to return the content
schedule to its previous place.
Editing Content Schedules
To edit, select a schedule registered on the server and click the Edit button (
).
1
2
Similar to creating a schedule, settings can be edited in Basic Properties, Schedule
Constraints and Content Schedule settings.
Tips
Undo Move -
Even when a schedule is moved multiple times,
only the last move can be undone.
Comentarios a estos manuales