Samsung MIM-B17 Manual de usuario Pagina 5

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 23
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 4
125
B
UILDING
M
ANAGEMENT
S
YSTEM
4) Connection diagram
For power distribution
On/Off
controller
Power line
R1-R2
R1-R2
R1-R2
F1-F2
F1-F2
F1-F2
Watt-hour meter
Electrical
substation
PIM
f MIM-B16(PIM) should be connected separately with outdoor units or controllers.
BACnet Gateway
BMS (BACnet)
5) Wiring
F1 F2 R1 R2
F1 F2 R1 R2
(CH = Channel)
(1) Connecting outdoor unit directly
Maximum 16 outdoor units can be connected to each channel
Total 80 outdoor units can be connected
(2) Connecting On/Off controller
Maximum 15 On/Off controller can be connected to each channel
;
Note
BACnet Gateway can connect outdoor unit and On/Off controller at the same time.
Outdoor unit and On/Off controller can be connected to 1 communication channel at the same time.
Vista de pagina 4
1 2 3 4 5 6 7 8 9 10 ... 22 23

Comentarios a estos manuales

Sin comentarios